TL;DR: A work order authorizes and tracks a job, while a purchase order approves what you spend with a supplier. Use a work order for the task, a purchase order for the purchase, and both when a vendor does the work. Our eSignature templates let you send each one for approval the same way every time.
A packaging machine breaks down on a Monday. Maintenance needs a contractor, the contractor needs parts, and finance needs to know who agreed to the cost. Three teams now touch one repair.
Two documents keep that repair under control: a work order and a purchase order. This guide explains what each one does, when you need one or both, and how to get them signed without chasing people by email.
Work order vs purchase order: what is the difference?
A work order is about doing the job, and a purchase order is about buying something from a supplier. One tracks the task, the other controls the spending.
Think of a home renovation. The list you give the builder, with each room and what to fix, is the work order. The signed order for tiles you place with a supplier is the purchase order.
Mixing them up lets work start before anyone approves it. Supplier bills then arrive with no context. Finance then has trouble matching costs to the original job.
Quick comparison: work order vs purchase order
The table sets the two documents side by side.
| Category | Work order | Purchase order |
|---|---|---|
| Main purpose | Authorizes and tracks work | Authorizes spending with a supplier |
| Used for | Repairs, maintenance, inspections, service tasks | Goods, services, materials, subscriptions |
| Usual owners | Operations, maintenance, facilities, service teams | Procurement, finance, purchasing teams |
| Question it answers | “What work needs to be done?” | “What are we buying and at what cost?” |
| Closes when | The work is done, checked and signed off | Goods arrive and the supplier’s bill matches the order |
| Approval focus | Work authorization and completion sign-off | Spend approval |
| Use in BoldSign | Task approval, completion sign-off, audit record | Procurement, finance, vendor or manager approval |
What is a work order?
A work order is a document that authorizes, assigns, tracks and verifies one specific task. It gives the person doing the job enough detail to do it right.
Teams use work orders for jobs like these:
- Equipment repairs and preventive maintenance
- Facility maintenance and site inspections
- Contractor jobs
- Internal service requests
What goes in a work order template?
A good work order answers what, where and who. Most templates hold these job details:
- Work order number and request date
- Location or site
- Asset or equipment details
- Description of the work and its priority
The record then needs the people and the result:
- Assigned technician, team or contractor
- Materials required
- Completion notes and completion date
- Requester or manager sign-off
The goal goes beyond starting the work. You want a record of what someone requested, what the team completed, and who approved it.
What is a purchase order?
A purchase order is a document that authorizes a purchase from a supplier before anything arrives. Once the supplier accepts it, finance and procurement use it as the record of that deal.
Teams raise purchase orders for purchases like these:
- Materials, parts and equipment
- Vendor services and contractor costs
- Recurring supplier orders
- Software subscriptions
What goes in a purchase order template?
A purchase order template first names the deal:
- Purchase order number
- Supplier name and buyer details
- Item or service description
- Quantity, unit price and total amount
The rest of the form covers delivery and approval:
- Delivery date
- Billing and shipping details
- Cost center or project code
- Procurement or finance approval
A purchase order stops spending nobody approved. Finance also gets a clear reference to check the supplier’s bill against.
When should you use a work order, a purchase order, or both?
Use a work order to track a job and a purchase order to approve spending with a supplier. Use both when a vendor supplies the parts or the labor.
| Scenario | Work order? | Purchase order? | Why |
|---|---|---|---|
| Internal team repairs office equipment | Yes | No | Nothing is bought from outside |
| Buying 50 replacement monitors | No | Yes | A purchase with no job to track |
| Contractor repairs a heating, ventilation and air conditioning (HVAC) system | Yes | Yes | Track the job and approve the vendor’s fee |
| Routine facility inspection | Yes | No | The task needs checking, with nothing to buy |
| Ordering replacement machine parts | Maybe | Yes | Add a work order when the parts belong to a repair job |
| Software subscription renewal | No | Yes | A vendor purchase, with no job to carry out |
| Emergency plumbing repair by an outside vendor | Yes | Yes | The job and the supplier’s cost both need records |
How do work order and purchase order workflows run?
The two documents follow different paths through your business. Each path ends with a different proof.
What are the steps in a work order workflow?
- Someone reports a need for work, and a manager reviews and prioritizes it.
- The manager assigns the task to a team, technician or contractor.
- The team schedules and completes the work.
- The team records time, materials and completion notes.
- A manager or the requester signs off, then the team closes and stores the work order.
The finished workflow proves that someone requested the work, the team did it, and a manager checked it.
What are the steps in a purchase order workflow?
- Someone creates a purchase request, and a budget owner approves the spend.
- Procurement sends the purchase order to the supplier.
- The supplier confirms the order and delivers the goods or services.
- Finance checks the supplier’s bill against the order.
- Finance releases the money and files the records.
The finished workflow keeps spending under control and makes each supplier bill easy to check.
Why does confusing work orders and purchase orders cause problems?
Small gaps between the two documents grow into delays and disputes. Most of the trouble comes from records that live in different places.
Watch for these signs:
- Work starts before anyone approves it.
- Vendor costs have no link to the original job.
- Finance receives supplier bills with too little context.
- Nobody can prove who approved what, or check finished work later.
Take a facilities team that approves a heating repair through a work order. The contractor also needs replacement parts, so procurement still asks for a purchase order. Finance then struggles to connect the bill to the repair, since the two documents share no reference.
The fix goes beyond choosing the right document. Connect the two documents clearly whenever both belong to the same job.
How does BoldSign help with work order and purchase order approvals?
We give you one place to prepare both documents, send them to the right approvers, and keep the signed copies. You stop chasing approvals through long email threads and scattered folders.
Build one template for each document
Create a separate template for work orders and one for purchase orders. Each template keeps its fields and signer roles in place, so only the names change each time you send.
Add only the fields an approver needs to decide. A shorter form gets a faster review and leaves less room for missing details.
Send each document to the right approvers
Work orders and purchase orders usually need different people:
- A work order goes to a facilities manager, operations lead or service supervisor.
- A purchase order goes to procurement, finance or a department head.
- A vendor job goes through both, operations first and purchasing second.
Turn on signing order and we send the document to the first signer only. Each next person gets it once the one before has signed.
Collect the completion sign-off
For a work order, the last signature matters most. A signed completion form shows that the work is done, the team logged materials and labor, and the requester accepted the result.
Contractors and suppliers can sign too. They open the document from our email and sign without a BoldSign account, as our help article on your role as a signer explains.
Keep an audit trail for every approval
Every signed document comes with an audit trail that records each signer, the time they signed and their device. You get it as one PDF with the signed document.
Finance can use it to show that someone approved the spend before the money went out. Operations can use it to show who signed off the finished job.
Link the two documents with a shared reference
Use a shared reference field whenever one job needs a work order and a purchase order. Pick one of these:
- Job reference or project code
- Work order number
- Site code or asset ID
- Vendor job number
Add the same field to both templates and put the reference in the document title. Searching for that reference then brings up both documents.
What does a contractor repair look like with both documents?
The work order and the purchase order move side by side, joined by one job reference. Picture a manufacturing site that hires an outside contractor to fix a packaging machine.
- Operations writes a work order for the fault, and the maintenance manager approves it.
- The contractor confirms the repair scope.
- Procurement raises a purchase order for the service and parts, and finance approves it.
- The contractor completes the repair, and the operations manager signs off the work order.
- Finance checks the bill against the order and files both documents under one job reference.
The work order proves someone finished the job. The purchase order proves someone approved the spend.
How do you set up work order and purchase order approvals in BoldSign?
Plan the approval rules first, then build the templates around them. Six steps cover the set-up.
Step 1: Decide which documents need signatures
Answer a few questions before you build anything:
- Does every work order need sign-off, or only high-value ones?
- Does every purchase order need finance approval?
- Do the rules change by department, amount, location or risk?
Clear answers keep simple requests out of approval steps they never needed.
Step 2: Create separate templates
Build one template for work orders and one for purchase orders. Keep each template focused on the fields approvers need to decide.
Step 3: Define signer roles
A role is a placeholder for a signer, which you fill with a real person when you send. For a work order, roles may include:
- Requester
- Operations manager
- Technician or contractor
- Completion approver
A purchase order usually needs these roles:
- Requester
- Procurement owner
- Finance approver
- Supplier representative
Step 4: Set the signing order
Put the roles in the order they should sign. A work order may need operations approval before contractor sign-off, and a purchase order may need department approval before finance.
Keep the order short. Fewer steps mean fewer documents stuck with the wrong person.
Step 5: Add a shared reference field
Add the same reference field to both templates whenever the documents belong together. That one field connects the finished work, the vendor cost and the final records.
Step 6: Store signed documents consistently
Agree on where signed copies live and how to name them. A pattern built from these parts works well:
- Document type and reference number
- Site or department
- Vendor name
- Date and status
Paper forms signed on site can join the same folders. The free BoldSign document scanner app turns them into PDFs and keeps files on your device, as our scanner storage article explains.
How much does BoldSign cost for work order and purchase order approvals?
The plan you need depends on how many templates you keep. Figures below come from the BoldSign pricing page in November 2026, with prices in USD and billed yearly.
The Essential plan is free and includes 2 templates, enough for one work order and one purchase order template. The Growth plan costs $5 per user a month and includes 10 templates.
The Business plan costs $15 per user a month and the Premium plan costs $99 a month for unlimited users. Both include unlimited templates, which suits teams with a separate form for each site or department.
Ready to get your work orders and purchase orders signed?
Pick the next step that fits your team:
- Start a 30-day free trial and build your first work order template.
- Schedule a demo to see an approval workflow set up for your documents.
- Read about the audit trail that comes with every signed document.
Frequently asked questions
What is the main difference between a work order and a purchase order?
A work order covers a job: what to do, where and by whom. A purchase order covers spending: what you buy, from which supplier and at what price.
Who usually creates a work order?
Operations, maintenance, facilities or service teams create most work orders. A requester reports the need, and a manager reviews and assigns it.
Who usually approves a purchase order?
Procurement, finance or a department head approves most purchase orders. Many teams set a spending limit above which a second approver signs.
Can one job need both a work order and a purchase order?
Yes. A contractor repair often needs a work order for the job and a purchase order for the contractor's fee and parts. Give both the same job reference.
Is a purchase order the same as an invoice?
They are different documents. You issue the purchase order before delivery to approve the purchase, and the supplier sends its invoice afterward to ask for the money.
What should a work order template include?
Start with a work order number, the location, the asset and a description of the job. Add priority, the assigned person, completion notes and a sign-off field.
Does a contractor need a BoldSign account to sign a work order?
No. Signers open the document from the email we send and sign in the browser without creating an account.
How many templates can I create in BoldSign?
The Essential plan includes 2 templates and the Growth plan includes 10. The Business and Premium plans include unlimited templates.